5th May 2016- Pea Drilling Update

20160504_125319_resized20160504_125352_resized20160504_132713_resized20160504_164051_resized20160504_163931_resized

So drilling continues in earnest now that things have significantly warmed up compared with 7 days ago and so hopefully now we can catch up for lost time. In the meantime the SUND header has had a makeover and is now ready for any recovery work needed and PMC are busy building our new 1089 which should be with us in June to then add some non-factory accessories. The first of the manganese sprays are now going on the early drilled crops along with Hallmark where needed as pea and bean weevil is now starting to make its presence. As for the organics these have now been einboked twice and it is hoped we will get one last go next week before the crop is too big. Next project in store is making a new water bowser as the other one is beyond repair.

Post a comment